This section shows the energy performance for features of a property. The assessment does not consider the condition of a feature and how well it is working.
Each feature is assessed as one of the following:
*Here is where your building information is situated on the EPC. This information does not relate to your property. This is an example and does not reflect your property.
Feature | Description | Rating |
---|---|---|
Wall | Cavity wall, as built, no insulation (assumed) | Poor |
Roof | Pitched, 75mm loft insulation | Average |
Window | Mostly double glazing | Poor |
Main heating | Boiler and radiators, mains gas | Good |
Main heating control | Programmer, no room thermostat | Very Poor |
Hot water | From main system, no cylinder thermostat | Average |
Lighting | Low energy lighting in all fixed outlets | Very Good |
Floor | Suspended, no insulation (assumed) | N/A |
Secondary heating | Room heaters, electric | N/A |
Here is where you will find if the assessor makes any recommendations for this property. Simple Energy Advice has guidance on improving a property's energy use.
Dwelling type: | End-Terrace | Referral number: | |
---|---|---|---|
Date of assessment: | March 19, 2010 | Type of assessment: | RdSAP, existing dwelling |
Date of certificate: | March 19, 2010 | Total floor area: | 70.26 m2 |
Example Current costs | Example Potential costs | |
---|---|---|
Lighting | £ 36 over 3 years | £ 36 over 3 years |
Heating | £ 834 over 3 years | £ 446 over 3 years |
Hot Water | £ 200 over 3 years | £ 116 over 3 years |
Totals |
You could save - over 3 years
These figures show how much the average household would spend on this property for heating, lighting and hot water and are not based on energy used by individual households. This excludes energy use for running appliances like TVs, computers and cookers, and electricity generated by microgeneration.
Example Recommendation measures | |
---|---|
3. Hot water cylinder thermostat | |
1. Increase loft insulation to 270 mm | |
2. Cavity wall insulation | |
4. Heating controls (room thermostat and TRVs) | |
5. Replace boiler with new condensing boiler | |
6. Solar water heating | |
7. Solar photovoltaic panels, 2.5 kWp |