This section shows the energy performance for features of a property. The assessment does not consider the condition of a feature and how well it is working.
Each feature is assessed as one of the following:
*Here is where your building information is situated on the EPC. This information does not relate to your property. This is an example and does not reflect your property.
Feature | Description | Rating |
---|---|---|
Wall | Cavity wall, as built, no insulation (assumed) | Poor |
Roof | Pitched, 150 mm loft insulation | Good |
Window | Mostly double glazing | Average |
Main heating | Boiler and radiators, mains gas, Boiler and radiators, mains gas | Average |
Main heating control | Programmer, room thermostat and TRVs | Good |
Hot water | From main system, no cylinder thermostat | Poor |
Lighting | Low energy lighting in 84% of fixed outlets | Very Good |
Floor | Solid, no insulation (assumed) | N/A |
Secondary heating | Room heaters, dual fuel (mineral and wood) | N/A |
Here is where you will find if the assessor makes any recommendations for this property. Simple Energy Advice has guidance on improving a property's energy use.
Dwelling type: | Semi-Detached | Referral number: | |
---|---|---|---|
Date of assessment: | June 21, 2024 | Type of assessment: | RdSAP, existing dwelling |
Date of certificate: | June 21, 2024 | Total floor area: | 303.0 m2 |
Example Current costs | Example Potential costs | |
---|---|---|
Lighting | £ 256 over 3 years | £ 256 over 3 years |
Heating | £ 5269 over 3 years | £ 2942 over 3 years |
Hot Water | £ 557 over 3 years | £ 228 over 3 years |
Totals |
You could save - over 3 years
These figures show how much the average household would spend on this property for heating, lighting and hot water and are not based on energy used by individual households. This excludes energy use for running appliances like TVs, computers and cookers, and electricity generated by microgeneration.
Example Recommendation measures | |
---|---|
1. Room-in-roof insulation | |
2. Cavity wall insulation | |
3. Floor insulation (solid floor) | |
4. Hot water cylinder thermostat | |
5. Replace boiler with new condensing boiler | |
6. Solar photovoltaic panels, 2.5 kWp |