This section shows the energy performance for features of a property. The assessment does not consider the condition of a feature and how well it is working.
Each feature is assessed as one of the following:
*Here is where your building information is situated on the EPC. This information does not relate to your property. This is an example and does not reflect your property.
Feature | Description | Rating |
---|---|---|
Wall | Cavity wall, as built, no insulation (assumed) | Poor |
Roof | Pitched, 50 mm loft insulation | Poor |
Window | Single glazed | Very Poor |
Main heating | Room heaters, electric | Very Poor |
Main heating control | No thermostatic control of room temperature | Poor |
Hot water | Electric immersion, standard tariff | Very Poor |
Lighting | Low energy lighting in 8% of fixed outlets | Very Poor |
Floor | Solid, no insulation (assumed) | N/A |
Secondary heating | Room heaters, electric | N/A |
Here is where you will find if the assessor makes any recommendations for this property. Simple Energy Advice has guidance on improving a property's energy use.
Dwelling type: | End-Terrace | Referral number: | |
---|---|---|---|
Date of assessment: | April 15, 2010 | Type of assessment: | RdSAP, existing dwelling |
Date of certificate: | April 15, 2010 | Total floor area: | 100.98 m2 |
Example Current costs | Example Potential costs | |
---|---|---|
Lighting | £ 87 over 3 years | £ 45 over 3 years |
Heating | £ 1768 over 3 years | £ 1177 over 3 years |
Hot Water | £ 480 over 3 years | £ 307 over 3 years |
Totals |
You could save - over 3 years
These figures show how much the average household would spend on this property for heating, lighting and hot water and are not based on energy used by individual households. This excludes energy use for running appliances like TVs, computers and cookers, and electricity generated by microgeneration.
Example Recommendation measures | |
---|---|
5. Solar water heating | |
6. Replace single glazed windows with low-E double glazed windows | |
7. Change heating to gas condensing boiler | |
1. Increase loft insulation to 270 mm | |
2. Cavity wall insulation | |
3. Increase hot water cylinder insulation | |
4. Low energy lighting for all fixed outlets | |
8. Solar photovoltaic panels, 2.5 kWp |
No tickets available.